Glassbox terms in plain words
The words teachers, students and parents meet in a Glassbox programme, each in a sentence or two. Print it, pin it up, or keep it open beside a lesson.
By Future Skills Singapore3 min read
Key takeaways
- A system is anything that takes inputs, follows rules and produces a result.
- An edge case is an input at the limit of what the rules expect; a failure case is one they were never built for.
- A human checkpoint is the decision a person, not the system, should make.
Words about systems
Every Glassbox project starts by naming these parts.
- System: anything that takes inputs, follows rules and produces a result. A planner, a sorter and a timetable checker are all systems.
- Input: what a system is given, such as a forecast, a budget or a photo.
- Rule: an instruction the system follows, often written as “if …, then …”.
- Output: what the system produces: a recommendation, a label or a flag.
- Decision point: the place where a system has to choose between outcomes.
- Exception: a situation the rules do not cover well.
Words about AI
AI systems follow patterns learned from examples rather than rules someone wrote down.
- Model: the part of an AI system that turns inputs into outputs using patterns it has learned.
- Training data: the examples a model learns from. What is missing from them shapes its mistakes.
- Classifier: a model that sorts inputs into groups, such as recyclable or not.
- Confidence: how sure a model reports it is. A confident answer can still be wrong.
- Prepared example: an AI output made in advance for a lesson and labelled as such, so students can examine it without using a live tool.
- Instructor demonstration: an AI tool shown on the instructor’s device, only if the school approves it.
Words about testing
Testing is where students meet the limits of what they built.
- Test case: one input chosen on purpose, with a note of what should happen.
- Ordinary case: an everyday input the system should handle.
- Edge case: an input at the limit of what the rules expect, such as a $0 budget.
- Failure case: an input the system was never built for, such as a missing forecast.
- Test log: the record of each case, what the system did, the result and any change made.
- Revision: a change to the rules or the model in response to a test.
The four test results
Every line of a Glassbox test log ends with one of four results. They describe what happened, not whether the student did well.
- Works as intended: the output fits the purpose and the limits.
- Gives a bad answer: the output breaks a limit or does not fit the purpose.
- Can’t tell yet: the test does not settle it; more information or another test is needed.
- Not tested yet: nobody has run this case. It stays on the list until someone does.
How to test a system shows a worked log with all four.
Words about judgement
- Human checkpoint: the decision a person, not the system, should make, named in every project.
- Checkpoint moves: what anyone can do at any stage: pause, test another way, ask a person, reject the output, revise, raise a concern, or decide not to automate.
- Limitation: something the system cannot do well, stated plainly.
See the learning approach for how these fit together.